Fabrication and supply of compressed air vessel having 33 bar operating pressure and tested at 50 bar pressure.
Replacement of Roler Dryer
Critical lifting performed to lift the roller dryer having capacity of 20 T with temporary lifting structure at designated site for nestle SKP.
Automatic Sliding Gates
Fabrication and installation of nestle KBF designated to ensure maximum safety of functioning and reliable long-lasting performances, having intelligent control.
Ketchup Plant
Placement of complete equipment of ketchup plant at its designated area Erection of platforms and piping has done for ketchup plant at Volka Foods.
Boiler's Chimney and Structure
Fabrication and installation of whole chimeny with height of 120 ft and diemeter of 1mtr at nestle SKP.
Fire Water Tank
The fire water tank could be custom designed as per the requirement of the owner or per the house size or environment conditions.